This is the installation of new asphalt to a previously prepared area. For example, a plumber replacing an inspection lid requires the asphalt around it to be reinstalled. The repair is expected to last more than 10 years.
Process
Step 1
Identify the prepared patch. (Prepared prior to us attending site)
Step 2
Apply tack to the patch to ensure increased adhesion.
Step 3
Apply asphalt and rake to the desired finish height.