1 min read

Asphalt Ramp for Lift Installation – Stirling Hwy, Nedlands

Monday, November 20th, 2023 

Today we installed an asphalt ramp for a smooth transition from the existing car park asphalt to the concrete base of a new lift installation in a building on Stirling Hwy in Nedlands. The lift has been installed by 808 Construction to assist visitors to access the building from the undercover car parking area.

808 Construction had kindly fully prepared the area ready for our asphalt team to come in and complete the installation.

As you can see in from the before and after images there is a now a nice transition between the raised concrete edge and the existing car park asphalt.

Thanks to our technician Anthony for a job well done and thanks to our friends at 808 Construction for engaging us to do the work! The ramp looks great!

For more information about 808 Construction and the great services they provide visit their website: 808 Construction

Before & After Pictures

Lift Ramp Nedlands AFT
Partially complete asphalt ramp installation
Area before asphalt ramp installation
Lift Ramp Nedlands AFT

Recent Posts